Please enable JS

Team Building of Asean Center for Energy (ACE)

img

NAME OF PROJECTS

Team Building of Asean Center for Energy (ACE)

TIME OF IMPLEMENTATION

19.02.2020 - 03.04.2020

DONOR / COMPANY

German Development Cooperation

Project Background

ACE is developed towards a center of excellence. As a center, ACE has to be managed professionally by a solid team. Individual capacity is indeed important. But also important is the organizational capacity, which is built from the organizational system. This includes communication and coordination mechanism. Talking about mechanism, it is not necessarily a formal system, such as procedure and standard. Working culture, communication nature, and team cohesiveness are very often more effective to build the system.

Project Objectives

The project aimed to develop concept and hold a team building session for ACE Team, with specific objectives to:

  • Increase mutual understanding
  • Build a better communication and cooperation atmosphere
  • Stimulate the building up of a strong, creative and productive teamwork
  • Refreshment from routine 

Project Activities

  • Developed the Team Building concept and design
  • Conducted the Team Building
  • Provided report and recommendation